Start-Up and Commissioning

The design, procurement and construction of a project is of little value unless the appropriate commissioning procedures are followed. They must be started during the design phase to assure that the startup can be easily accomplished. The training of the Owner’s personnel is just as critical as any other activity. EFFECTIVE PROJECT CORPORATION understands the special considerations that must be employed in a successful commissioning of a facility.

Our services include:

Startup Design Considerations

  • Initial Charging
  • System Cleaning and Preparation
  • Safety and HAZOP Reviews
  • Quality Testing Review

Training

  • Operators
  • Maintenance Personnel
  • Engineering Staff

Startup and Commissioning

  • Process and Equipment Review
    • Equipment Certification
  • P&ID Review
  • Safety Procedures
  • Detail Startup Plan
  • Line and Equipment Cleaning
  • Pre-commissioning of Rotating Equipment
  • Equipment Run-In
  • Equipment Dry-Out
  • Instrumentation
  • Calibration Checks
    • Loop Checks
  • Alarm Checks
  • Emergency Shutdown (ESD) Checkout
  • System Charging
    • Catalyst
    • Chemicals
  • Commissioning and Initial Operations

Performance Testing and Verification

  • Design and Operating Cases
  • Turndown Requirements
  • Efficiency

Final Documentation

  • Preparation of Record Drawings
  • Operation Description and Procedures
  • Cold Startup
  • Hot Startup
  • Normal Shutdown
  • Emergency Shutdown
  • Instrument Index with Setpoints
  • Vendor Drawings and Manuals
  • Spare Parts List
  • Programming Printout (DCS and PLC)